Australia-Asia PowerLink, Stage 3, BUSINESS CASE EVALUATION SUMMARY
Review summary Infrastructure Australia has evaluated the business case for Australia-Asia PowerLink in accordance with their Statement of Expectations, which requires us to evaluate project proposals that are nationally significant…
Australia-Asia Power Link
Australia–Asia Power Link Location Country Australia State Northern Territory Ownership information Owner Sun Cable Construction information Expected 2027 (projected) Commissioned A$35 billion Technical information Power rating 17-20 GW The Australia–Asia…
SingaporeLink
SingaporeLink is the international component of the AAPowerLink project, focused on developing the offshore transmission system extending from Darwin to Singapore (via Indonesian waters). From the Northern Territory, 4,300km of…
Australia, Victoria, Wooreen Energy Storage System
Wooreen Energy Storage System will be constructed on the traditional lands of the Brayakaulung people of the Gunaikurnai nation. EnergyAustralia respects and acknowledges their continued connection to Country, culture, and…
New solar farm – Genesis takes another step in delivering renewables strategy
New solar farm – Genesis takes another step in delivering renewables strategy Fact Box About Genesis Energy Genesis Energy (NZX: GNE, ASX: GNE) – Is a diversified New Zealand energy…
Snowy 2.0
❄️ Working in Winter at Snowy 2.0! Winter at the Snowy 2.0 project takes the average day for the workforce to a whole new level! In the season’s peak, the…
ACT Government, 2024–2030, OUR PATHWAY TO ELECTRIFICATION
Climate change is one of the biggest challenges we face. The ACT is proud to lead on meaningful climate change action and reducing greenhouse gas emissions. In 2020 we were…
POWERING CANBERRA – Our Pathway To Electrification, August 2022
POWERING CANBERRA – Our Pathway ToElectrification The ACT is proud to be a world leader in climate action and we are now taking the next step forward toget us closer…
Australia, Buronga Substation, 120MVAr synchronous condensers (syn cons)
Offline testing has begun!🌟 Ever since the arrival of two 120MVAr synchronous condensers (syn cons) late last year, the EnergyConnect team at Buronga substation has been working hard to assemble…
Strategic Energy Plan (2020)
Publication date Monday 20 January 2020 The Independent Review into the Future Security of the National Electricity Market recommended that the COAG Energy Council develop and maintain a Strategic Energy…